

BENGHAZI: Repairs were carried out on Saturday on a Libyan oil pipeline badly damaged by an explosion four days earlier, an engineer said.
The explosion on Tuesday ? about 130 kilometres (80 miles) south of the Es Sider terminal ? reduced output by an estimated 70,000-100,000 barrels per day (BPD), according to the National Oil Corporation (NOC).
A picture sent to Reuters by the engineer ? who asked not to be named because he was not authorised to speak to the media ? showed workers attending to a stretch of exposed pipeline.
Other photos posted online showed a new section of pipe being lowered into the ground by a digger.
The work on Saturday would be followed by testing, the engineer said. It was not clear how long it would take for production to be restored.
Waha Oil Co ? which operates the pipeline ? has described the cause of the explosion as a ?terrorist attack?, without giving any details.

0 Comments
Recommended Comments
There are no comments to display.
Join the conversation
You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.